Showing posts with label Falcon 9. Show all posts
Showing posts with label Falcon 9. Show all posts

Thursday, April 16, 2009

SpaceX Announces Another Two Falcon 9 Flights

Today, SpaceX announced that they were adding another two Falcon 9 flights to their schedule. Both of the flights were purchased by CONAE, the Argentina national space agency.

Didn't know Argentina had a national space agency? I sure didn't.

But that's the great thing about SpaceX. They're doing spaceflight much more cheaply than has been available in the past, meaning that smaller governments or (more relevant for the purposes of this website) private companies can purchase spaceflight services.

Both of the spaceflights will take place in 2010. If successful, the flights will launch two identical satellites into orbit, both to be used for measuring soil moisture on Earth, among other earth-observation purposes.

Yep, Argentina is launching two satellites into space to keep track of how wet their dirt is.

Insert joke here.

Trip to Space
Progress: 4.58%  Flight Time: 0:06:52
Solar Array
Progress: 3.28%  Power: 49W

Tuesday, January 13, 2009

Falcon 9 Goes Vertical!

In another milestone for Spacex's Falcon 9 heavy lift spacecraft, the first model has been lifted vertically at Cape Canaveral.

This is quite a sight. And why? Well, It is a craft like this, launched from this location, that is likely to lift the Sundancer space hotel prototype from Bigelow Aerospace into orbit.

There are a few other launches to go before that happens, though, and this one will launch soon. A flight window has not yet been given, but it will likely be within the next few weeks.

And here's a picture! Credit SpaceX.
And no, this image has not been edited in any way. It just happens to be particularly awesome.


Progress: 3.93%  Flight Time: 0:05:54

Wednesday, December 31, 2008

Falcon 9 Assembly Nearing Completion

I wasn't sure this website would make it this far, but this is my hundredth post. Hooray! That is, if you don't count posts I've deleted because I mistakenly published them and posts that I've started writing but that haven't been... um... posted yet. But I don't count those, so why should you?

So for my hundredth post, I've decided to take a break from all this catch-up nonsense (keep sucking on that porcupine, NBC) and report on some exciting news that is happening right now.

The progress to SpaceX's Falcon 9 rocket has steadily proceeded, and after its earlier successful test firing, it is now being assembled for its first launch at Cape Canaveral.

The first stage flight tank arrived at the cape on December 18th, and was lifted off the truck on December 21st. Since then, assembly of the rocket has gone extremely well by all accounts. If no problems crop up, assembly will be complete as soon as today.

Even more exciting for SpaceX, NASA has officially selected them to provide cargo transfer service to the International Space Station using the Falcon 9 launch vehicle and SpaceX's Dragon-class spacecraft. Really, though, this comes as no surprise, since you don't demolish a launch pad unless you have a good reason.

Oh, here's some cool assembly pictures, credit SpaceX. Notice how small those traffic cones are compared to the nine Merlin engines at the bottom of the rocket, and how those in turn are dwarfed by the rocket itself.



Progress: 4.03%  Flight Time: 0:06:05

Friday, December 5, 2008

SpaceX Announces DragonLab Missions

Just a month after SpaceX announced the development of its DragonLab reusable unmanned spacecraft, it has formally announced the addition of two DragonLab missions to its already ambitious mission manifest.

The first flight of the DragonLab spacecraft (aboard a Falcon 9 rocket) is scheduled for 2010, and the second will launch in 2011. The specific payloads of these flights have not been announced; in fact, the SpaceX press release implies that the cargo has not even been chosen, and that SpaceX has chosen its launch date in part to give interested clients set dates that their payloads could fly if they purchased DragonLab cargo space.

In addition, because DragonLab will include its own propulsion systems, more applications are being discussed, such as spacecraft servicing missions and cargo delivery to the International Space Station

The other purpose of DragonLab, of course, is to prepare and test the technology necessary to launch the planned manned Dragon spacecraft, which will use the same basic structure and hardware as DragonLab.

In addition to this, SpaceX has recently made a successful flight-length test of the complete Falcon 9 propulsion system, so things are looking up for them!

Progress: 4.03%  Flight Time: 0:06:05

Tuesday, November 4, 2008

SpaceX Announces DragonLab

SpaceX came out with a pretty big announcement today; they announced the development of a vehicle intended for cargo transfer and experimentation: the DragonLab.

The DragonLab is an intermediate step toward their proposed Dragon spacecraft. The Dragon spacecraft will be VOTE a manned vehicle launched aboard the Falcon 9 rocket, the first of which is under construction. If it is successful, it will likely be used to transfer crew to the International Space Station after the Space Shuttle is retired.

The DragonLab will be an unmanned cargo vehicle that will be able to supply the International Space Station (through NASA's COTS program) and it VOTE will be capable of independent pressurized and unpressurized experimentation. The DragonLab will use much of the VOTE same technology and structure as the manned Dragon spacecraft, so it will also provide a way to test various systems in advance of the manned version.

This of course, has little or nothing to do with space tourism. I'm writing about it for three reasons:

1. Because SpaceX will likely be indirectly VOTE involved in space tourism through the anticipated launch of the Sundancer space hotel prototype aboard one of its Falcon 9 rockets.

2. Because SpaceX's dragon logo is really really cool (see below).

3. As an excuse to VOTE write a really VOTE annoying VOTE post VOTE on VOTE Election VOTE Day.

Enjoy!


Progress: 4.03%  Flight Time: 0:06:05

VOTE

Friday, June 6, 2008

Various Pieces of SpaceX News

Well, SpaceX came out with a couple of press releases in the past few days, one of which is indirectly related to space tourism, so I thought I'd summarize them here.

The first item is that NASA has awarded a launch services contract to SpaceX. This contract calls for SpaceX to provide launch services to NASA for four years with its Falcon 1 and Falcon 9 rockets. The quantity and dates of these launches has yet to be determined, but we will undoubtedly see SpaceX's launch schedule change due to this development.

The second (and to me, more exciting) development is that SpaceX has successfully completed its first five-engine test of the Falcon 9 rocket. The test was performed in a cross formation, much like the Saturn V rockets. This is the last step in the test schedule before the testing of the full compliment of 9 engines. The first Falcon 9 rocket will be delivered to Cape Canaveral toward the end of this year, and it will be responsible for launching heavy satellites, the manned Dragon capsule currently in development, and a payload for Bigelow Aerospace in a couple of years that is thought to be its Sundancer space hotel prototype.

Oh, and here's a picture of cool fiery rockets! Credit SpaceX.



Progress: 3.73%  Flight Time: 0:05:35

Thursday, May 1, 2008

Falcon Launch Site Blown Up

Haha, okay, that title is a bit misleading. Well, maybe very misleading. But I couldn't resist.

In all seriousness, workers at Cape Canaveral blew up the Titan 4 mobile launch platform, located at Launch Complex 40. This platform has mostly been used for military Titan launches, but it has also been used for some NASA launches, including the Cassini-Huygens mission to Saturn.

The demolition is the first step in the preparation of the launch site for SpaceX's launches of their Falcon 9 rockets, currently being developed and assembled. Much of the plumbing and electronics at the site will be re-used. Falcon 9 launches have been ordered by both military and private sources, including Bigelow Aerospace, who will likely launch a human-habitable inflatable space station prototype on one of the rockets sometime around 2010.

Oh, and here are some awesome pictures of destruction:




Images credit Spaceflight Now

Progress: 3.73%  Flight Time: 0:05:35

Monday, March 31, 2008

SpaceX Conducts Three-Engine Test

And on to the next piece in the recent onslaught of news!

SpaceX announced just last week that they have successfully conducted their first rocket burn using three engines. This is a critical step in the development and construction of their Falcon 9 rocket, which will use nine of their Merlin 1C engines.

While they were burning, the engines generated over 270,000 pounds of force, and consumed 1,050 lbs of fuel per second. The next step for them is to test the system with five engines, and then the full nine. The Merlin 1C engines have power similar to the Saturn V engines. Except there will be nine of them.

These tests will likely start coming fast and furious, as the first Falcon 9 is set to be delivered by the end of the year, so I'll keep you updated.

Progress: 3.89%  Flight Time: 0:05:50

Tuesday, March 4, 2008

Bigelow Aerospace

There are a few companies out there that are taking on the goal of creating space habitats for tourism purposes, but none of them are as promising as Bigelow Aerospace.

Bigelow Aerospace was founded in 1999 by Robert Bigelow. The company purchased rights from NASA to technologies that had been researched for NASA's canceled Translab program. The particular technologies they were interested in were designs for inflatable space station modules. Bigelow Aerospace took these designs and ran with them, quickly beginning design and production of prototype modules based on the technology.

Inflatable technology has several advantages. The modules are launched in a compressed state, allowing for a launch vehicle's typically volume-limited design. After the vehicle reaches orbit and the module has separated, it is inflated with breathable air, creating a much larger orbital habitat. The use of a flexible outer shell also makes the module much lighter then conventional metal habitation modules.

Concern has been raised about the prospect of meteorite impacts potentially puncturing the modules' walls and causing them to deflate. However, those concerns have been at least somewhat discouraged by the fact that the modules' walls are made of several layers of vectran, a material twice as tough as kevlar. If you shot the walls, you would have to dodge the ricochet. Also, a meteor impacting a flexible surface that was tough enough would theoretically bounce off where it might damage a rigid surface, due to the fact that the energy would largely be transferred back to the meteor.

On July 12, 2006, Bigelow Aerospace successfully launched the Genisis I, a 3000 lb, 15 foot prototype module. After achieving orbit, it successfully inflated and deployed its solar panels, and it orbits the Earth to this day. Bigelow hopes to keep it operating for at least another three years. Just a year later, on June 28, 2007, Bigelow launched Genisis II, their second prototype. Genisis II is similar to Genisis I, except that it contains twice as many cameras and a more complex array of sensors and other devices. Also, Genisis II contains an array of random items sent in by interested members of the public for Bigelow's "Fly Your Stuff" program.

Initially, Bigelow had plans to launch a larger prototype craft called the Galaxy, but the success of Genisis was so great, and launch costs are increasing so much, that they canceled the Galaxy program and are skipping to their full-size, human-habitable Sundancer prototype, to launch between 2010 and 2012. The speculation is that the Sundancer will be launched on board a SpaceX Falcon 9 rocket, but this hasn't been confirmed. If the launch and deployment of the Sundancer is successful, crew may be transported to it to further test its capabilities. Following that will be the launch of the first BA 330 (the first full-scale, production module) from 2012-2014.

And after that, a space hotel becomes a significant possibility. And remains an awesome possibility.

Progress: 3.24%  Flight Time: 0:04:51

Monday, March 3, 2008

SpaceX Releases Mission Manifest

Well, it seems as if SpaceX has really been busy of late, and is ramping up for full-scale operations. They just released their revised mission manifest for launches from this spring all the way to 2011. There is some pretty interesting stuff here! It goes something like this:

CustomerLaunch Date  Launch Vehicle  Launch Site
US Government & ATSBQ2 2008Falcon 1Kwajalein
ATSB (Malaysia)Q3 2008Falcon 1Kwajalein
US GovernmentQ4 2008Falcon 9Cape Canaveral
MDA Corp. (Canada)2009Falcon 9Cape Canaveral
Avanti Communications (UK)2009Falcon 9Cape Canaveral
NASA COTS - Demo 12009Falcon 9Cape Canaveral
NASA COTS - Demo 22009Falcon 9Cape Canaveral
SpaceDev2009Falcon 1Kwajalein
NASA COTS - Demo 32010Falcon 9Cape Canaveral
MDA Corp. (Canada)2010Falcon 1Kwajalein
Swedish Space Corp. (Sweden)  2010Falcon 1Kwajalein
Bigelow Aerospace2011Falcon 9Cape Canaveral

Some of these are simply communications satellite launches. However, the items 5, 6, and 8 that say NASA COTS are of some interest. These are demonstration launches of SpaceX's pressurized Dragon capsule. The NASA COTS program (Commercial Orbital Transportation Services) has been set up to finance demonstration flights by several commercial space launch companies to see who might best be able to provide cargo and crew transportation for the international space station after the space shuttle retires, but before the Ares/Orion vehicle project is completed. These three launches will demonstrate the capabilities of the Dragon capsule for NASA, in the hopes that it will be chosen to transport astronauts to the International Space Station. These will also serve as the Dragon's only currently planned test flights (SpaceX is all about the saving of the moneys).

The second interesting item is launch 7. This launch is being performed for SpaceDev, the company that designed SpaceShipOne's rocket, and is a former competitor in the COTS program. The goal of this launch is to put a number of very small satellites in orbit (called micro- and nanosatelites) developed by SpaceDev and others to advance the technologies behind mini floaters of doom. Or something.

The last, but most interesting item is the last on the list, the launch for Bigelow Aerospace. Bigelow Aerospace is a company that is developing very exciting space habitat technologies based on an inflatable design originally developed by NASA. The payload on this launch will likely be Bigelow's Sundancer prototype craft, the third of Bigelow's flight prototypes, though this has not been confirmed. If successful, this launch will almost certainly lead to more interesting space tourism potential.

It looks like SpaceX is going to attempt its first satellite launch this spring without having made a successful test flight, so one way or another, this will be an exciting year for the company! I posted in greater detail about SpaceX just last week here, I will post in greater detail about Bigelow Aerospace in the next few days, and a full profile of SpaceDev is on my to-do list later down the road.

Progress: 3.24% Flight Time: 0:04:51

Thursday, February 28, 2008

SpaceX Completes Merlin 1C Testing

SpaceX, a possible contender to transport astronauts to the International Space Station after the retirement of the space shuttle, has announced that they have completed qualification testing on their Merlin rocket engine. To explain to you what this means, I'll go a little bit into SpaceX's history and future plans. They were one of the next companies on my list anyway.

Despite the fact that SpaceX's services seem likely to be purchased by government organizations rather than space tourism interests, the technologies it is developing (at the very least) could be quite useful to the space tourism industry. It was founded in 2001 by Elon Musk, whose more interesting accomplishments have included the co-founding of PayPal, and he is currently the chairman of Tesla Motors. The goal of SpaceX seems to be to make satellite launch, and eventually the launch of manned spacecraft, much less expensive than it has been. One of the ways that they are doing this is to operate with much fewer personnel than most other space programs; they had 400 employees as of November, and they've already made two test launches.

SpaceX launches its rockets from the Martial Islands with an on-site crew of a mere 25 people. Their first rocket, called the Falcon 1, is a two-stage rocket with a single engine on each stage. The first stage has a Merlin engine, and the second a Kestrel, both of which are low-cost engines designed by SpaceX. The rocket is designed to take smaller satellites into low Earth orbit. They first tested this rocket in March 25, 2006 after four months of weather- and technology-related delays. The flight lasted 29 seconds, consisted of the first stage engine lighting itself on fire, and was topped off by a spectacular dive into the ocean. They traced the cause of the failure to a corroded nut on the fuel tank.

So do you remember that Far Side comic where a worker at the airport finds a nut on the runway, and a plane falls apart in mid-air? Yeah, that happened here.

They tried again a year later, on March 21, 2007, this time with a simulated payload and shiny new stainless steel nuts. They had a couple of aborts during the two days before launch; one was at T-1:02, and one was just a half of a second before the engines would have fired. This is actually fairly impressive; they have set up a system in which they are able to abort mere seconds before launch and quickly return to a configuration where they can try again if the cause of the abort is minor (which it was; the fuel was a tad too cold). When they launched, just an hour after the second abort, the rocket performed very well. It made it to space, but was aborted just before it could reach orbit due to control issues caused by the sloshing back and fourth of the fuel.

SpaceX has since found and eliminated the cause of the sloshing (it was started by unexpected movement caused by first stage separation), and they plan on launching a third Falcon 1 this spring. The third launch is actually a paid satellite launch for the US Navy, which is where this Merlin qualification becomes important. The completed qualification testing has done a couple things; it verified the final design for the Merlin 1C so that SpaceX can begin mass production of the engines. It has cleared the way for the next stage of testing for use in the Falcon 9 launch vehicle. And finally, it comprised the last requirement necessary for paid satellite launch operations. This springs launch is likely to be played live on the web as the previous two were, so I'll post the details of when and where it will be when I get them.

SpaceX has some ambitious future plans. By the end of this year, they plan on delivering the first Falcon 9 rocket to Cape Canaveral. Falcon 9 will facilitate the launch of much more massive payloads into orbit. Its first stage will contain 9 Merlin rockets, and the second stage will contain a single Merlin rocket. Beyond that, SpaceX is designing the Merlin 9 Heavy, which will be a Merlin 9 modified to launch with two boosters, each containing 9 more Merlin rockets, for a total of 27. That is a lot of launching power!

Even more exciting are their designs for a manned spacecraft called The Dragon. The Dragon will be a mercury-like capsule that will be able to hold 7 astronauts, or can be reconfigured for cargo transport. SpaceX intends to use this capsule to sell services to NASA to transport crew and supplies to the International Space Station when the space shuttle is retired.

And that's about it! My initial assumptions about this company seem to be flawed; they plan to sell their services to anyone, not just governments, which could potentially open their efforts up directly to space tourism. Some very exciting possibilities are in the works for this company. And they have already made a mockup of their Dragon capsule. I'll leave you with a picture of its very cool logo:


Credit: SpaceX

Progress: 3.24%  Flight Time: 0:04:51